From your idea to the solution.
A transparent process that turns requirements into a technical and commercial proposal.

Understand the project
Define the material, dimensions and destination.
What we need from you
Specify the application, whether you need blocks or another format, quantity and unit, and required dimensions. Attach drawings, photographs and technical requirements where available.
What to confirm with the team
Clarify specifications still to be defined, the desired finish and the destination country and location. These details help frame the enquiry.
When to proceed
Prepare an enquiry with clear references. Flag areas where guidance is needed; an initial enquiry does not confirm stock, price or timeframe. Identify a contact person to coordinate questions and reduce repeated requests for clarification.
Review and propose
Review specifications and commercial terms.
What we need from you
Share your priorities and questions about the material or proposal received. Identify alternatives you would like to review.
What to confirm with the team
Confirm material, format, quantity, finish, items included in the price, validity, payment and indicative timeframe. Availability and processing options must be confirmed by the team.
When to proceed
Proceed once you understand the scope and written terms. A proposal is only binding once formally confirmed; photographs do not confirm availability. If alternatives are offered, ask for differences in material, format and terms to be identified in the proposal.
Prepare and support
Agree the material and verification points.
What we need from you
Gather proposal references and communicate any changes to dimensions, quantity or finish before preparation.
What to confirm with the team
Request lot identification and records of the material under consideration. Natural stone varies in colour and veining; one photograph does not represent every block. Agree verification points and follow-up arrangements.
When to proceed
Confirm accepted specifications and changes in writing. Preparation and follow-up are limited to the scope defined in the proposal. Keep the final approved version as a reference for comparing the enquiry with the material to be supplied.
Transport and destination
Define the destination and logistics responsibilities.
What we need from you
Specify the country, city and delivery location. Share restrictions affecting access, equipment and unloading at the destination.
What to confirm with the team
Clarify packaging, route, indicative timeframe and who handles transport, insurance, loading, unloading and import procedures under the agreed terms.
When to proceed
Confirm the route, dates and responsibilities for the specific supply. A location in Namibe does not imply a single route for every order. Share special destination requirements before finalising terms so they can be considered in the logistics arrangements.
Documentation and receipt
Confirm documents and arrival checks.
What we need from you
Specify the documents and technical requirements the buyer needs and the recipient details required on the documentation.
What to confirm with the team
Confirm the documents available for this supply and the receiving procedure: quantity, identification and material condition. Do not assume certificates or tests exist without specific verification.
When to proceed
Before dispatch, align documentation and agreed checks. On receipt, record discrepancies and report them with the order references. Keep the order reference, agreed documents and receiving records together to make later clarification easier.
